I need to make a system for rice husk conveying trough a pipe,
System discription.
A fan will be installed at end of the suction pipe on elevated position, the fan will suck the rice husk inserted in the pipe and elevate it 5m above the datum line in the same stream of air generated by fan installed at the end through a filter installed in line with very low head losses. The target flow rate of husk is 80 ton/day.
I need a help for the calculation of the following parameters....