I am considering a tube railing system to transport a carriage. It will incorporate gear track/gear drive motion. I wish to support this on 1" to 1 1/2" steel tubing. the rate of travel will be 6' a second.
Is this possible on such small deminsions. I have had experience on much larger tubing and the speed was not a factor. I fear the smaller gear and gear track will limit speed and duty cycle.
I am also having problems finding Gear Track and Drive gears. All I have found are plastic and I feel will not hold up.
Also, gear track found is for flat mounting and not concave to match tubing. I do not wish to employ costly machining to set Track.
Duty cycle will be 5 to 10 seconds with rests up to 10 seconds. Duration of use can be upto 24 hours but will be more aptly 8 hours.
Distance of travel 6', return 6'. (Complete Cycle.
Thank you,
Jokenda
Is this possible on such small deminsions. I have had experience on much larger tubing and the speed was not a factor. I fear the smaller gear and gear track will limit speed and duty cycle.
I am also having problems finding Gear Track and Drive gears. All I have found are plastic and I feel will not hold up.
Also, gear track found is for flat mounting and not concave to match tubing. I do not wish to employ costly machining to set Track.
Duty cycle will be 5 to 10 seconds with rests up to 10 seconds. Duration of use can be upto 24 hours but will be more aptly 8 hours.
Distance of travel 6', return 6'. (Complete Cycle.
Thank you,
Jokenda