- #1
gary350
- 274
- 66
I removed the high voltage secondary winding of a microwave oven transformer and replaced it with 9 turns of wire I need 2.1 vac 50 amps. Should I remove the shunts?
I have a 100a bridge rectifier I need 3 vdc 50a for about 5 to 7 days. I don't think a MOT is 100% duty cycle so I plan to use a 1500 w variac to power the MOT with 60 vac or less to be able to run for 7 days continuous.
150 watts is not much but I still want built in safety shut down.
I have a 100a bridge rectifier I need 3 vdc 50a for about 5 to 7 days. I don't think a MOT is 100% duty cycle so I plan to use a 1500 w variac to power the MOT with 60 vac or less to be able to run for 7 days continuous.
150 watts is not much but I still want built in safety shut down.
Last edited: