Need your help with a small issue that we can't seem to resolve.
I live in Miami, FL. We were asked to hire an outside independent engineer to certify that our stages were being built to manufacturers specifications. We submitted CAD drawing for each stage along with load requirements with our permit application which has historically been the only requirement and inspected by City of Miami, FL building dept prior to event and by City of Miami, FL fire dept during setup.
These stages are temporary structures erected by certified stage contractors and not permanent. I have called 2 engineers to attempt at complying with this ridiculous request 4 days prior to the event and both stated that they would not accept because they are not willing to incur the liability on their license for a temporary structure which is totally understandable.
Please help me in finding a resolution to this surprise.
I live in Miami, FL. We were asked to hire an outside independent engineer to certify that our stages were being built to manufacturers specifications. We submitted CAD drawing for each stage along with load requirements with our permit application which has historically been the only requirement and inspected by City of Miami, FL building dept prior to event and by City of Miami, FL fire dept during setup.
These stages are temporary structures erected by certified stage contractors and not permanent. I have called 2 engineers to attempt at complying with this ridiculous request 4 days prior to the event and both stated that they would not accept because they are not willing to incur the liability on their license for a temporary structure which is totally understandable.
Please help me in finding a resolution to this surprise.