- #14,176
SteveElbows
- 637
- 9
Filling in more questions about timing, this time in relation to fuel removal from reactor 4 pool.
I think the last we heard about this was a pool & reactor debris survey from August:
http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130809_07-e.pdf
According to that the debris removal work should have started in late August, and I expect that if they don't get stuck, we will hear about the next phase before the end of this year.
edited to add that schedule can be seen in this document from later in August, after they formed a plan based on the debris survey I just mentioned:
http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130826_07-e.pdf
Fuel removal currently scheduled to start mid-november according to that.
I think the last we heard about this was a pool & reactor debris survey from August:
http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130809_07-e.pdf
According to that the debris removal work should have started in late August, and I expect that if they don't get stuck, we will hear about the next phase before the end of this year.
edited to add that schedule can be seen in this document from later in August, after they formed a plan based on the debris survey I just mentioned:
http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130826_07-e.pdf
Fuel removal currently scheduled to start mid-november according to that.