- #36
tsutsuji
Gold Member
- 1,219
- 15
http://www3.nhk.or.jp/news/genpatsu-fukushima/20131007/index.html At 9:47 AM on 7 October, unit 1 reactor water injection temporarily stopped, but it was restarted soon afterwards using a backup system. Other equipments such as unit 1 and unit 2 PCV gas purification systems also stopped and were similarily restarted using backup systems. The cause is an employee pushing a stop button during an electric power panel inspection.
http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_131007_08-j.pdf Japanese language handout about the equipment shutdowns. The timeline says reactor injection pump B was automatically switched to pump A at 10:10 AM.
Fukushima Daiichi accident analysis study group 4th meeting, 7 October 2013 : http://www.nsr.go.jp/committee/yuushikisya/jiko_bunseki/20131007.html
--> 1st meeting : https://www.physicsforums.com/showpost.php?p=4400944&postcount=14004
http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_131007_08-j.pdf Japanese language handout about the equipment shutdowns. The timeline says reactor injection pump B was automatically switched to pump A at 10:10 AM.
Fukushima Daiichi accident analysis study group 4th meeting, 7 October 2013 : http://www.nsr.go.jp/committee/yuushikisya/jiko_bunseki/20131007.html
http://www.nsr.go.jp/committee/yuushikisya/jiko_bunseki/data/0004_99.pdf Agenda
http://www.nsr.go.jp/committee/yuushikisya/jiko_bunseki/data/0004_01.pdf Unit 4 hydrogen explosion
http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_131007_03-j.pdf Timing of the tsunami arrival into the plant premises (Japanese, 35 pages)
http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_131007_04-j.pdf Enlarged photographs of the arrival of the tsunami (19 pages)
http://www.nsr.go.jp/committee/yuushikisya/jiko_bunseki/data/0004_04.pdf Possibility of unit 3 recriticality
http://www.nsr.go.jp/committee/yuushikisya/jiko_bunseki/data/0004_05.pdf Possibility of unit 1 small scale LOCA after tsunami arrival
http://www.nsr.go.jp/committee/yuushikisya/jiko_bunseki/data/0004_01.pdf Unit 4 hydrogen explosion
http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_131007_03-j.pdf Timing of the tsunami arrival into the plant premises (Japanese, 35 pages)
http://www.tepco.co.jp/nu/fukushima-np/handouts/2013/images/handouts_131007_04-j.pdf Enlarged photographs of the arrival of the tsunami (19 pages)
http://www.nsr.go.jp/committee/yuushikisya/jiko_bunseki/data/0004_04.pdf Possibility of unit 3 recriticality
http://www.nsr.go.jp/committee/yuushikisya/jiko_bunseki/data/0004_05.pdf Possibility of unit 1 small scale LOCA after tsunami arrival
--> 1st meeting : https://www.physicsforums.com/showpost.php?p=4400944&postcount=14004
Last edited by a moderator: